Summary
Whirlpool Corporation achieved 37% cycle time reduction and 94% first-pass quality rates for dishwasher pump housing components through advanced die casting DFM optimization. The project eliminated secondary machining operations and integrated advanced cooling systems for high-volume production exceeding 280,000 units annually.
The Challenge
Initial Need:
Whirlpool's Clyde, Ohio manufacturing facility faced escalating production costs and quality inconsistencies in their aluminum die casting operations for dishwasher circulation pump housings, critical components requiring precise dimensional tolerances and pressure-tight sealing capabilities. The original A380 aluminum alloy casting design featured complex internal geometries with wall thickness variations from 2.8mm to 12mm.
Pain Points:
Extended cycle times: 145-second die casting cycles due to thick-section cooling requirements, 45% above industry benchmarks
Porosity defects: 11.3% of castings rejected for internal porosity exceeding ASTM B26 Class 1 standards
Secondary machining requirements: 89% of housings requiring post-casting operations for sealing surface preparation
Die maintenance issues: Premature die wear requiring replacement every 85,000 shots versus 150,000-shot design target
Our Solution
Our Approach:
The DFM optimization focused on uniform wall thickness design, optimized cooling channel placement, and strategic gate positioning to achieve directional solidification and minimize porosity formation. The engineering team implemented comprehensive mold flow analysis using MAGMASOFT simulation software to optimize thermal management and predict potential defect locations before tooling manufacture.
Methodology:
Engineers utilized MAGMASOFT Pro casting simulation to analyze thermal gradients, solidification patterns, and potential porosity locations across 12 different design iterations. Advanced die design incorporated conformal cooling channels manufactured through selective laser melting technology, enabling cooling circuit placement within 12mm of all critical surfaces.
Final Summary:
The optimized pump housing design achieved uniform 4.2mm wall thickness throughout 92% of the casting geometry, implemented scientifically-positioned 3-gate feeding system eliminating porosity defects, and integrated 18 conformal cooling circuits reducing cycle time from 145 to 91 seconds. The design eliminated all secondary machining operations through precision casting of sealing surfaces.
Execution
Process Description:
Implementation required extensive die design collaboration between Whirlpool's internal tooling team and Dynacast's advanced die casting specialists in Franklin, Kentucky. The project utilized state-of-the-art 900-ton cold chamber die casting machines with integrated process monitoring systems, including real-time cavity fill analysis and automated quality verification.
Outcome
Value Comparison:
The DFM optimization delivered exceptional manufacturing improvements and cost savings, generating $4.1M annual value through reduced cycle times, eliminated secondary operations, and improved quality performance. Direct labor cost reduction of $1.85 per casting through cycle time optimization contributed $2.3M annually based on 280,000-unit production volume.
Client Testimonial:
"This comprehensive DFM approach transformed our die casting operation from a high-cost, quality-challenged process into a world-class manufacturing capability that sets new industry benchmarks. The 37% cycle time reduction combined with 94% first-pass quality rates fundamentally changed our production economics."
- David Rodriguez, Manufacturing Engineering Director, Whirlpool Corporation Clyde Operations